Outcome
Estimated likelihoods at publication
15% estimated chance
Will this outcome be true at the resolution cutoff? Assume the Future Interceptor program’s expected execution path is materially disrupted by 2027-03-31 after the reported U.S. Army selection of Lockheed Martin for an estimated $1.08 billion missile-defense effort. The operational change is a public cancellation, termination, sustained award protest requiring a recompete, suspension of funded work, or material reduction in scope or value that prevents the reported selection from converting into the previously expected Lockheed Martin execution path. The precise schedule, funding profile, and any revised program value are unavailable unless reported by the resolving source.
By 2027-03-31 · Estimated 2026-11-19
Confidence: low
(a) Time left: There are 132 days remaining until the outcome is known. (b) Status quo: The program is an active, high-priority, funded OTA with Lockheed Martin, with no broadly confirmed disruptions or suspensions currently in place. (c) Scope: Disruption includes cancellation, termination, sustained protest, recompete, or material downscope. It requires a significant, formalized negative event, not just a procedural rumor or budget debate. (d) Reason for No: The majority of the research indicates no active GAO protest, and a full program cancellation within five months of a major award is historically rare (the median time to cancellation is over 4 years). The Army's strategic prioritization of the PAC-3 Edge makes sudden, unprovoked termination highly unlikely. (e) Reason for Yes: One piece of research mentions a potential GAO protest filed in mid-November 2026. If true, and if the GAO sustains it (historically a ~14% chance) or if the Army takes voluntary corrective action (bringing total effectiveness to ~52%), this would materially disrupt the expected execution path by March 2027. Additionally, unexpected budget constraints could trigger a downscope. (f) Bets: I would be comfortable paying 15 cents for a YES bet and 85 cents for a NO bet. The risk of disruption heavily relies on the small chance of an active, successful protest or a sudden budget zeroing, neither of which is well-supported by the consensus evidence. My final probability is 15%.
Modeled impact if this scenario occurs. This analysis shows what the model estimates could happen if this scenario occurred, not how likely the scenario is.
For information only. Not investment advice.
Assume the Future Interceptor program’s expected execution path is materially disrupted by 2027-03-31 after the reported U.S. Army selection of Lockheed Martin for an estimated $1.08 billion missile-defense effort. The operational change is a public cancellation, termination, sustained award protest requiring a recompete, suspension of funded work, or material reduction in scope or value that prevents the reported selection from converting into the previously expected Lockheed Martin execution path. The precise schedule, funding profile, and any revised program value are unavailable unless reported by the resolving source.
These sources support the scenario assumptions. They do not validate the model results.
Source evidence for this Possible Future.
The inputs recorded when the scenario was written.
Current multi-asset market estimates are unavailable.
This estimates the defining event. The modeled impacts depend on the scenario assumptions.