The Federal Aviation Administration exercised little oversight over the network upgrade work that triggered Friday’s nationwide ground stop, CNN reported, citing sources who pointed to a 2025 agency memo that changed policy to streamline air traffic control modernizations. One source told CNN that “there was no monitoring” of the work, even as the Washington Post previously reported that an FAA official in rural Arkansas supervised and tested a contractor’s switch of communications lines from copper wire to fiber eight minutes before radio services began faltering across the US.
Engineers and analysts investigating the nearly five hour shutdown have replicated the router failure at the El Dorado, Arkansas, facility that overwhelmed the air traffic network with more than 1,000 connection attempts every four to five seconds, CNBC reported. Transportation Secretary Sean Duffy said investigators still have not determined the root cause of why the 69th router replacement flooded the system after 68 earlier swaps succeeded.




