SPY
S&P 500 ETF
100% of holdings weight modeled
· Holdings date unavailable
Outcome
Estimated likelihoods at publication
28% estimated chance
Will this outcome be true at the resolution cutoff? Assume AST SpaceMobile materially advances its internal BlueBird launch-capability program before the resolution date through operational execution tied to the Firefly agreement. The initiating change is not merely the November 2026 engine contract announcement: AST, Firefly, or a reliable company filing/source confirms delivery, acceptance, qualification, hot-fire testing, or integration/testing of Miranda or Vira engines for AST’s first internal rockets. The known reported scope is an agreement for 36 engines, including 27 Miranda and 9 Vira engines, intended for the first three AST internal rockets; exact delivered quantities, test cadence, and launch-readiness milestones remain whatever is reported at the time.
By 2027-03-31 · Estimated 2026-11-19
Confidence: low
With approximately 132 days (about 4 months) until the March 31, 2027 resolution date, AST SpaceMobile and Firefly Aerospace have only recently signed their $1.3 billion engine agreement (November 2026). The status quo is that while Firefly has hot-fired its Miranda engine for its own purposes, no AST-specific hardware milestones have occurred. A "No" outcome is highly likely because hardware manufacturing and testing have significant lead times, typically ranging from 12 to 24 months. Furthermore, Firefly is currently prioritizing the qualification of the Miranda engine for its own Eclipse rocket. While a "Yes" outcome could happen if Firefly rushes to allocate an existing test article to the AST program to secure an early milestone payment and generate positive PR, the short 4-month window makes actual delivery, acceptance, or a dedicated AST hot-fire improbable. In terms of a bet, I would be comfortable risking 72 cents to win $1 on a NO outcome, aligning with a 28% probability for YES.
Modeled impact if this scenario occurs. This analysis shows what the model estimates could happen if this scenario occurred, not how likely the scenario is.
For information only. Not investment advice.
Assume AST SpaceMobile materially advances its internal BlueBird launch-capability program before the resolution date through operational execution tied to the Firefly agreement. The initiating change is not merely the November 2026 engine contract announcement: AST, Firefly, or a reliable company filing/source confirms delivery, acceptance, qualification, hot-fire testing, or integration/testing of Miranda or Vira engines for AST’s first internal rockets. The known reported scope is an agreement for 36 engines, including 27 Miranda and 9 Vira engines, intended for the first three AST internal rockets; exact delivered quantities, test cadence, and launch-readiness milestones remain whatever is reported at the time.
These sources support the scenario assumptions. They do not validate the model results.
Source evidence for this Possible Future.
Across the equities priced in this scenario, the market-cap-weighted return is +0.0%.
Modeled sector returns range from 0.0% for Technology to +0.1% for Telecommunications.
The inputs recorded when the scenario was written.
Tilt multi-asset model 1.8 · 2026-11-24 market data · 99.3% of eligible equity market value covered
S&P 500 ETF
100% of holdings weight modeled
· Holdings date unavailable
Nasdaq-100 ETF
100% of holdings weight modeled
· Holdings date unavailable
Dow Jones ETF
100% of holdings weight modeled
· Holdings date unavailable
The multi-asset model weights each outcome by its probability. Returns apply to modeled holdings.
5,560 of 6,010 companies returned a modeled response · 10 shown
Sorted by absolute scenario-implied equity value change.
This estimates the defining event. The modeled impacts depend on the scenario assumptions.