The state-owned energy company of Abu Dhabi has refuted reports that it is exploring a new project to transport oil from its western fields to the eastern coast of the UAE. Adnoc described claims that it was studying a 3rd crude export corridor to move shipments directly to the port of Fujairah, bypassing the Strait of Hormuz, as “inaccurate and purely speculative.”
The dismissed proposal would have supplemented the existing Adcop pipeline, which moves approximately 1.8 MBPD, and the ongoing West-East pipeline. That second conduit is currently about 50% complete and is scheduled to begin moving roughly 1.5 MBPD of offshore crude by early 2027. Together, these lines would allow the UAE to export approximately 3.6 MBPD without traversing the Hormuz chokepoint as the country seeks to increase total production capacity to 5 MBPD by 2027.
